The Mallberry Suites Expansion Project is now on its final stages of construction. The tower crane, a fixture last year during its construction has been removed.

Based on photos below, the extension (Building B) I think is ready for occupancy as airconditioning units are already installed. Work is now focused on the 10th floor of center building (Building C) aside from painting of the exteriors.

The following photos were taken from different points, namely: Gaisano Mall Food Court, and along Osmeña Street.




Leave a Reply.